Before
Brick and crownsA new top and a poured crown for a tall brick chimney
The top seven rows rebuilt, a new concrete crown poured in place, and the whole chimney sealed once it cured.
A new gas fireplace built from the ground up: a concrete pad, a gas line under the slab, a firebox and block core, natural stone and a linear burner.

Where it started
This side yard started as bare dirt along the house. The goal was a patio with a gas outdoor fireplace. So the first few weeks went to the parts no one sees once it is finished.
On the job
An outdoor fireplace has to start below the ground. Before any stone went up, three things had to be in place:
The plan
A block core gives the fireplace its shape and strength, and gives the heavy stone something solid to hold on to. Running the gas line under the slab means no pipe shows once the patio is done.
To reach the gas supply, we opened up the back of the home's existing brick chimney for the plumber, then laid those same bricks back in when the plumbing was done.
Step by step
In late March the area was graded and formed, rebar went down, and the concrete pad was poured.
A licensed plumber ran a flex gas line under the slab and fitted it to where the firebox would sit. We opened the back of the existing brick chimney so he could reach the gas supply, and laid those bricks back in once he was done.
With the gas in place, the firebox went up in April, followed by a block core that gives the fireplace its shape and strength.
At the end of April we cleaned up the yard and started on the stone. Over the next few days the crew wrapped the core in natural stone and finished it with a solid stone top.
In mid-May the linear burner went in on a bed of black fire media, set against a herringbone firebrick back, and the fireplace was lit for the first time.
Finished
About two months after site prep started, the patio has a finished stone fireplace at its center.
Looking after it
Stone and block on a solid pad are built to last for decades. The gas parts are what need regular care. A yearly check keeps the burner lighting cleanly and burning safely.
Planning a fireplace?
Questions worth answering before the first shovel goes in:
We are glad to talk it through before anything is built.
More from this job



Questions
This one took about 18 days on site, spread over about two months, from site prep to first fire.
A licensed plumber runs the gas line. We plan the build around it and work with the plumber so it is in place before the fireplace goes up.
Yes. Our NFI certified techs service and repair gas fireplaces and gas logs, indoors and out.
Yes. A wood-burning fireplace needs a chimney tall enough to carry smoke away, so we plan for that from the start.
Talk to a real person
Tell us what you have in mind. A certified tech will call you back to talk through the options for your yard.
We call back within one business day, Monday to Friday, 8 to 5.
Your first visit is a full chimney inspection with photos and a written report you keep. We’ll go over the cost when you call.
You get a written list of what needs fixing now and what can wait. Our own crew does the work, and every repair comes with our workmanship guarantee.
Ask about our military and first responder discount.